subject
Mathematics, 29.07.2019 15:30 princeton23124

Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to build and 4 hours to test. each adult bike requires 6 hours to build and 4 hours to test. with the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. if c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 10 child bikes and 12 adult bikes in the week. no, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 no, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
Astudent received the following grades last semester. find the student's semester grade point average. an a is algebra (3 credits), a b in history ( 3 credits), a in sociology ( 3 credits) a d in english ( 3credits) and a c in seminar ( 2credits). an a is worth 4 points, a b is worth 3 points a c is worth 2 points and a d is worth 1 point.
Answers: 2
question
Mathematics, 21.06.2019 23:00
Afunction, f(x), represents the height of a plant x months after being planted. students measure and record the height on a monthly basis. select the appropriate domain for this situation. a. the set of all positive real numbers b. the set of all integers oc. the set of all positive integers od. the set of all real numbers reset next
Answers: 3
question
Mathematics, 21.06.2019 23:30
Solve for x and select the correct answer
Answers: 1
question
Mathematics, 22.06.2019 02:30
The gdp is $1,465.2 billion. the population is 249,793,675. find the per capita gdp.
Answers: 1
You know the right answer?
Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to...
Questions
question
Mathematics, 24.07.2019 07:30
question
Computers and Technology, 24.07.2019 07:30