Mathematics, 01.08.2019 04:30 natjon528
The local amusement park was interested in the average wait time at their most popular roller coaster at the peak park time (2 p. they selected 13 patrons and had them get in line between 2 and 3 p. m. each was given a stop watch to record the time they spent in line. the times recorded were as follows (in minutes) (mean = 114.15): 118, 124, 108, 116, 99, 120, 148, 118, 119, 121, 45, 130, 118 what is the variance?
Answers: 1
Mathematics, 21.06.2019 16:00
Weak battery is considered to be a part of routine a. inspection b. wear and tear c. maintenance d. check
Answers: 2
Mathematics, 21.06.2019 19:00
What are the solutions of the equation? 6x^2 + 11x + 4 = 0 a. 4/3, 1/2 b. -4/3, -1/2 c. 4/3, -1/2 d. -4/3, 1/2
Answers: 2
Mathematics, 21.06.2019 20:30
Aswimming pool had 2.5 million liters of water in it. some water evaporated, and then the pool only had 22 million liters of water in it. what percent of the water evaporated?
Answers: 2
The local amusement park was interested in the average wait time at their most popular roller coaste...
Mathematics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
History, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Physics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10
Chemistry, 21.02.2021 05:10
Mathematics, 21.02.2021 05:10