subject
Mathematics, 30.07.2019 06:20 slauravillalta

Using new equipment, a worker finished 4 more parts in an hour than was planned and fulfilled his daily task not in 8 hours but in 6 hours. how many parts did the worker had to finish that day according to schedule? i really need and asap i beg plz

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Mr switzer needs to buy new 1-foot tiles to cover his bathroom floor. the floor is 12 feet long and 8 feet wide. each square foot of tile will cost $1.79. in dollars what will be the total cost of the tiles he needs to buy.
Answers: 3
question
Mathematics, 21.06.2019 15:10
Point a is located at (0, 4), and point c is located at (−3, 5). find the x value for the point b that is located one fourth the distance from point a to point c. −0.25 −0.5 −0.75 −1
Answers: 1
question
Mathematics, 21.06.2019 16:40
One of the inventors of integrated circuits observed that the number of transistors that fit on an integrated circuit will double every 24 months. what type of relationship most appropriately models this situation?
Answers: 3
question
Mathematics, 21.06.2019 17:30
Terri makes a quilt using three sizes of fabric squares the side lenght of each fabric square is the square root of the area
Answers: 2
You know the right answer?
Using new equipment, a worker finished 4 more parts in an hour than was planned and fulfilled his da...
Questions
question
Mathematics, 14.01.2021 05:50
question
Mathematics, 14.01.2021 05:50