subject
Mathematics, 27.07.2019 10:10 jtingley0502

The local amusement park was interested in the average wait time at their most popular roller coaster at the peak park time (2 p. they selected 13 patrons and had them get in line between 2 and 3 p. m. each was given a stopwatch to record the time they spent in line. the times recorded were as follows (in minutes; mean = 114.15): 118, 124, 108, 116, 99, 120, 148, 118, 119, 121, 45, 130, 118. what is the variance?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Solve the system. -a+4b+2c=-8 3a+b-4c=9 b=-1 a.(0,11) ,-1,2) c.(1,1,-2) d.(2,-1,-1)
Answers: 1
question
Mathematics, 21.06.2019 15:00
Simplify (a/b - b/a) times (a - a^2/a+b) a - a^2/a=b is a mixed number
Answers: 2
question
Mathematics, 21.06.2019 18:00
Place the following steps in order to complete the square and solve the quadratic equation,
Answers: 1
question
Mathematics, 21.06.2019 19:30
Solve the following simultaneous equation by using an algebraic method (either substitution or elimination) 2x + 3y=-4 4x-y=11
Answers: 1
You know the right answer?
The local amusement park was interested in the average wait time at their most popular roller coaste...
Questions
question
Mathematics, 28.10.2020 22:00
question
Mathematics, 28.10.2020 22:00
question
Mathematics, 28.10.2020 22:00
question
Mathematics, 28.10.2020 22:00