Finally, mrs. solar receives the time estimates from each contractor. she wants to have the work done within 5 wk (200 work-hours) of when the work is started, and the sooner the better. she also wants to get a good deal. (a) contractor 1's time estimate: 210 h what is contractor 1's total cost? (b)contractor 2's time estimate: 195 h what is contractor 2's total cost? (c)contractor 3's time estimate: 185 h what is contractor 3's total cost? (d)which contractor should mrs. solar choose? explain your reasoning.
Answers: 1
Mathematics, 21.06.2019 15:00
Δabc is reflected across line l to form δ alblcl, and a¯¯¯al¯¯¯¯ intersects line l at point d. which equation is not necessarily true?
Answers: 3
Mathematics, 21.06.2019 19:20
Aefg - almn. find the ratio of aefg to almn. a)1: 4 b)1: 2 c)2.1 d)4: 1
Answers: 1
Mathematics, 21.06.2019 19:30
Arestaurant chef made 1 1/2 jars of pasta sauce. each serving of pasta requires 1/2 of a jar of sauce. how many servings of pasta will the chef be able to prepare using the sauce?
Answers: 1
Finally, mrs. solar receives the time estimates from each contractor. she wants to have the work don...
Mathematics, 18.10.2019 02:20
History, 18.10.2019 02:20
Mathematics, 18.10.2019 02:20
Social Studies, 18.10.2019 02:20
Mathematics, 18.10.2019 02:20
English, 18.10.2019 02:20
Mathematics, 18.10.2019 02:20
English, 18.10.2019 02:20
Social Studies, 18.10.2019 02:20
Mathematics, 18.10.2019 02:20