subject
Mathematics, 24.07.2019 04:10 mary9590

20 points shawn and ellie are construction workers. shawn can complete a concrete job in 4 hours, while ellie can complete it in 6 hours. the foreman says that it will take them 5 hours to complete it if they work together. explain each step in solving this equation, and determine if the foreman is correct or not.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
The ksp expression for the system pbcl2(s) pb+2(aq) + 2 cl-(aq) is: [pbc12][pb+2][2cl-] [pb+2][cl-]2 [pb+2][2cl-]2 [pbcl2][pb+2][cl-]2 [pb+2][2cl-]2[pbcl2]
Answers: 1
question
Mathematics, 21.06.2019 19:00
Solve the problem. a student earned grades of c, a, b, and a in four different courses. those courses had these corresponding numbers of credit hours: 4, 5, 1, and 5. the grading system assigns quality points to letter grades as follows: a = 4, b = 3, c = 2, d = 1, and f = 0. compute the grade point average (gpa) and round the result to two decimal places. 3.40 3.50 8.75 2.18
Answers: 1
question
Mathematics, 21.06.2019 20:00
Which fraction is equal to 1hole and 2/5? a.3/5 b.75 c.57 d.73
Answers: 2
question
Mathematics, 22.06.2019 01:20
The ratio of the height of two similar cylinders is 4 to 3 what is the ratio of their volumes
Answers: 1
You know the right answer?
20 points shawn and ellie are construction workers. shawn can complete a concrete job in 4 hours, wh...
Questions
question
Mathematics, 25.03.2021 05:30
question
Mathematics, 25.03.2021 05:30
question
Mathematics, 25.03.2021 05:30