subject
Mathematics, 21.07.2019 05:50 jkirby29

Aproduction line is to be designed for a job with three tasks. the task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes. the maximum cycle time in minutes is:

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
If a =6, what is the value of 2a(3b + 5c)?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Does anyone know how to solve and graph this: 4 + | a + 2 | < 7the only part i don't get is the "4 +"
Answers: 2
question
Mathematics, 21.06.2019 22:30
Given that y varies directly to the square root of (x + 1), and that y = 1 when x = 8,(a)express y in terms of .x,(b)find the value of y when x = 3,(c)find the value of x when y = 5.
Answers: 1
question
Mathematics, 22.06.2019 03:00
Describe how the presence of possible outliers might be identified on the following. (a) histograms gap between the first bar and the rest of bars or between the last bar and the rest of bars large group of bars to the left or right of a gap higher center bar than surrounding bars gap around the center of the histogram higher far left or right bar than surrounding bars (b) dotplots large gap around the center of the data large gap between data on the far left side or the far right side and the rest of the data large groups of data to the left or right of a gap large group of data in the center of the dotplot large group of data on the left or right of the dotplot (c) stem-and-leaf displays several empty stems in the center of the stem-and-leaf display large group of data in stems on one of the far sides of the stem-and-leaf display large group of data near a gap several empty stems after stem including the lowest values or before stem including the highest values large group of data in the center stems (d) box-and-whisker plots data within the fences placed at q1 â’ 1.5(iqr) and at q3 + 1.5(iqr) data beyond the fences placed at q1 â’ 2(iqr) and at q3 + 2(iqr) data within the fences placed at q1 â’ 2(iqr) and at q3 + 2(iqr) data beyond the fences placed at q1 â’ 1.5(iqr) and at q3 + 1.5(iqr) data beyond the fences placed at q1 â’ 1(iqr) and at q3 + 1(iqr)
Answers: 1
You know the right answer?
Aproduction line is to be designed for a job with three tasks. the task times are 0.4 minutes, 1.2 m...
Questions
question
Geography, 04.12.2020 22:50
question
Mathematics, 04.12.2020 22:50