subject
Mathematics, 25.08.2019 12:30 ecenteno2004

Aworker at a computer factory can assemble 8 computers per hour.
how long would it take this worker to assemble 200 computers?
a.
8 h
b.
20 h
c.
25 h
d.
200 h

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
Name the most appropriate metric unit for each measurement
Answers: 3
question
Mathematics, 21.06.2019 18:10
Josh has a rewards card for a movie theater he receives 15 points for becoming a rewards card holder he earns 3.5 points for each visit to the movie theater he needs at least 55 points to earn a free movie ticket which inequality can josh use to determine x, the minimum number of visits he needs to earn his first free movie ticket.
Answers: 1
question
Mathematics, 21.06.2019 19:00
What is the best way to answer questions with a x expression in the question. for example 3x + 10x=?
Answers: 1
question
Mathematics, 21.06.2019 20:00
The rectangle shown has a perimeter of 108 cm and the given area. its length is 6 more than five times its width. write and solve a system of equations to find the dimensions of the rectangle.
Answers: 3
You know the right answer?
Aworker at a computer factory can assemble 8 computers per hour.
how long would it take this...
Questions
question
Biology, 05.10.2021 07:40
question
Physics, 05.10.2021 07:40