subject
Mathematics, 16.03.2022 14:00 lizbethh62

Which gives the correct values for points A, B, C, and D? A number line going from negative 2 to negative 1. There are 5 equal spaces between the numbers. A = negative 1 and one-fifths, B = negative 1 and two-fifths, C = negative 1 and three-fifths, D = negative 1 and four-fifths A = negative 1 and one-fifths, B = negative 1 and four-fifths, C = negative 1 and three-fifths, D = negative 1 and two-fifths A = negative 1 and four-fifths, B = negative 1 and three-fifths, C = negative 1 and two-fifths, D = negative 1 and one-fifth A = negative 1 and four-fifths, B = negative 1 and one-fifth, C = negative 1 and three-fifths, D = negative 1 and two-fifths

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Tomas is making trail mix using granola and walnuts. he can spend a total of $12 on the ingredients. he buys 3 pounds of granola that costs $2.00 per pound. the walnuts cost $6 per pound. he uses the equation to represent the total cost, where x represents the number of pounds of granola and y represents the number of pounds of walnuts. he solves the equation for y, the number of pounds of walnuts he can buy. answer- b tomas added 6 to both sides of the equation instead of subtracting 6. just took the test
Answers: 1
question
Mathematics, 21.06.2019 18:00
Solve this system of equations. 12x βˆ’ 18y = 27 4x βˆ’ 6y = 10
Answers: 1
question
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m βˆ’ 1) : (2n βˆ’ 1).
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Which gives the correct values for points A, B, C, and D? A number line going from negative 2 to neg...
Questions
question
Mathematics, 05.05.2020 08:56
question
Mathematics, 05.05.2020 08:56
question
Mathematics, 05.05.2020 08:56