A builder of houses needs to order some supplies that have a waiting time Y for delivery, with a continuous uniform distribution over the interval from 1 to 4 days. Because she can get by without them for 2 days, the cost of the delay is fixed at $200 for any waiting time up to 2 days. After 2 days, however, the cost of the delay is $200 plus $30 per day (prorated) for each additional day. That is, if the waiting time is 3.5 days, the cost of the delay is: $200 + $30(1.5) = $245.

Find the expected value of the builder's cost due to waiting for supplies.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Refer to the table below if needed. second quadrant third quadrant fourth quadrant sin(1800- - cos(180° -) tan(180°-e) =- tane cot(1800-0) 10 it to solo 888 sin(180° +c) = - sine cos(180° +) =- cose tan(180° +c) = tane cot(180° +o) = cote sec(180° + c) = - seco csc(180° +2) = - csce sin(360° -) =- sine cos(360° -) = cose tan(360° - e) =- tane cot(360° -) = -cote sec(360° -) = seco csc(360° -) = csco sec(180° -) = csc(180° -) = csca 1991 given that sine = 3/5 and lies in quadrant ii, find the following value. tane
Answers: 2
question
Mathematics, 21.06.2019 20:00
The table shows the age and finish time of ten runners in a half marathon. identify the outlier in this data set. drag into the table the ordered pair of the outlier and a reason why that point is an outlier.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Find the slope of the line passing through a pair of points
Answers: 2
question
Mathematics, 21.06.2019 21:30
‼️‼️‼️10 points‼️‼️‼️ me it’s important‼️‼️‼️‼️‼️
Answers: 1
You know the right answer?
A builder of houses needs to order some supplies that have a waiting time Y for delivery, with a con...
Questions
question
Social Studies, 01.01.2020 19:31
question
Mathematics, 01.01.2020 19:31
question
English, 01.01.2020 19:31