A piece of work can be finished in 8 days, what part of the work is done in 2 days

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:40
What is the celsius temperature that is equal to 94 degrees fahrenheit using the formula f=9/5 c+32
Answers: 2
question
Mathematics, 22.06.2019 00:30
Which equation can be solved to find one of the missing side lengths in the triangle? cos(60o) = cos(60o) = cos(60o) = cos(60o) = mark this and return
Answers: 3
question
Mathematics, 22.06.2019 00:30
What is the slope of any line parallel to the line 8x+9y=3 in the standard (x,y) coordinate plane?
Answers: 1
question
Mathematics, 22.06.2019 03:20
Through which points should a line of rotation be placed to create a cylinder with a radius of 3 units
Answers: 2
You know the right answer?
A piece of work can be finished in 8 days, what part of the work is done in 2 days...
Questions
question
Mathematics, 11.03.2021 22:20
question
Mathematics, 11.03.2021 22:20
question
Mathematics, 11.03.2021 22:20