subject
Mathematics, 30.01.2022 01:00 kyleemarie2003

Two pools are being filled with water. To start, the first pool contains 776 liters of water and the second pool is empty. Water is being added to the first pool at a rate of 18.25 liters per minute. Water is being added to the second pool at a rate of 42.5 liters per minute.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:20
The function a represents the cost of manufacturing product a, in hundreds of dollars, and the function b represents the cost of manufacturing product b, in hundreds of dollars. a(t) = 5t + 2 b(t) = 7t - 2t +4 find the expression that describes the total cost of manufacturing both products, a(t) + b(t). a. 7t^2 - 7t + 2 b. 7t^2 + 3 +6 c. 7t^2 + 7t - 6 d. 7t^2 - 3t + 6
Answers: 3
question
Mathematics, 21.06.2019 17:30
If f(x) =3x-2 and g(x) =2x+1 fins (f+ g) (x)
Answers: 1
question
Mathematics, 21.06.2019 18:00
Which ordered pair is a solution to the system of linear equations? 2x + 3y= 6 –3x + 5y = 10
Answers: 1
question
Mathematics, 21.06.2019 19:00
What is the expression in factored form? -20x^2 - 12x a. 4x(5x+3) b. -4x(5x-3) c. -4(5x+3) d. -4x(5x+3)
Answers: 2
You know the right answer?
Two pools are being filled with water. To start, the first pool contains 776 liters of water and the...
Questions
question
English, 10.10.2021 05:20
question
Mathematics, 10.10.2021 05:20
question
Mathematics, 10.10.2021 05:20
question
Mathematics, 10.10.2021 05:20
question
Mathematics, 10.10.2021 05:20