Mathematics, 20.12.2021 06:00 levy72

A special piece of equipment is used at a construction site to dig holes. A hole is dug to a depth of 3.25 feet when the equipment hits rock. The progress slows to 5/8 feet per hour of digging. The depth of the hole must be at least 11 1/2 feet by the end of the day to stay on schedule. What is the minimum amount of time the equipment must continue at its present rate to complete the hole on schedule? Select from the drop-down menus to correctly complete the statement.
The equipment requires at least 13 or 23 hours and 2/6/12/36 minutes to complete the hole on schedule.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
Will give brainliestbased on the topographic map of mt. st. helens, what is the contour interval if the volcano height is 2,950 m?
Answers: 3
question
Mathematics, 21.06.2019 23:30
Asinusoidal function whose frequency is 1/6pi
Answers: 2
question
Mathematics, 21.06.2019 23:30
Written as a simplified polynomial in standard form, what is the result when (2x+8)^2(2x+8) 2 is subtracted from 8x^2-38x 2 −3?
Answers: 3
question
Mathematics, 21.06.2019 23:30
The experience c-0.25c can be used to find the cost of an item on sale for 25% off which expression beloit equivalent to c-0.25c
Answers: 1
You know the right answer?
A special piece of equipment is used at a construction site to dig holes. A hole is dug to a depth o...
Questions
question
Spanish, 12.06.2021 14:00
question
English, 12.06.2021 14:00
question
Advanced Placement (AP), 12.06.2021 14:00
question
Social Studies, 12.06.2021 14:00
question
Health, 12.06.2021 14:00
question
English, 12.06.2021 14:00