subject
Mathematics, 12.12.2021 06:10 glyptictriton9575

A company has two large computers. The slower computer can send all the company’s email in 50 minutes. The faster computer can complete the same job in 30 minutes. If both computers are working together, how long will it take them to do the job?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Turner's mom measured his room to see how long the wallpaper border needed to be. if two walls are 15 feet long and two walls are 12 feet long, how long should the strip of border be cut?
Answers: 1
question
Mathematics, 21.06.2019 16:00
30 pts, will mark brainliestwhat is the period of the sinusoidal function? (picture 1)what is the minimum of the sinusoidal function? (picture2)what is the maximum of the sinusoidal function? (picture 3)
Answers: 3
question
Mathematics, 21.06.2019 19:00
Suppose that one doll house uses the 1 inch scale, meaning that 1 inch on the doll house corresponds to 1/2 foot for life-sized objects. if the doll house is 108 inches wide, what is the width of the full-sized house that it's modeled after? in inches and feet.
Answers: 2
question
Mathematics, 22.06.2019 06:30
Look at the figure. classify the pair of angles 2 and 7
Answers: 1
You know the right answer?
A company has two large computers. The slower computer can send all the company’s email in 50 minute...
Questions
question
Mathematics, 17.12.2021 01:50
question
Mathematics, 17.12.2021 01:50
question
Mathematics, 17.12.2021 01:50