subject
Mathematics, 01.12.2021 19:00 snowflakekitty001

Suppose that a project manager tested the strength of one tile out of a batch of 3,000 to be used on a building. This one sample measurement was compared with the design specification and, in this case, the sampled tile's strength exceeded that of the specification. On this basis, the project manager accepted the tile shipment. If the sampled tile was defective (with a strength less than the specification), the project manager would have rejected the lot. Required:
a. What is the probability that ninety percent of the tiles are substandard, even though the project manager's sample gave a satisfactory result?
b. Sketch out the operating characteristic curve for this sampling plan as a function of the actual fraction of defective tiles.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Taking algebra two apex courses and need with these questions
Answers: 1
question
Mathematics, 21.06.2019 17:00
If the wwight of a package is multiplied by 7/10 the result is 65.8 find the weight of the package
Answers: 1
question
Mathematics, 21.06.2019 21:30
You dug a hole that was 8 feet deep. after taking a short break, you dug down 3 more feet in the same hole. when finished digging, a tractor accidentally filled the hole with 4 feet of dirt. how deep is your hole now?
Answers: 2
question
Mathematics, 22.06.2019 00:30
What is the interquartile range of this day at set?
Answers: 1
You know the right answer?
Suppose that a project manager tested the strength of one tile out of a batch of 3,000 to be used on...
Questions
question
Mathematics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30
question
Physics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30
question
Mathematics, 21.05.2021 06:30