subject
Mathematics, 25.11.2021 07:10 Packergood

Jack started his production supervisor job at Nabisco Bakery Plant in Maxton, NC, then got promoted to be quality control manager. He wanted to survey the Oreo production line, to make sure the product meets the highest quality standards. The operators started an inspection of 100 cookies every hour, and assess whether the cookies coming off the production line would be as perfect as possible. They would report any defectives out of each random sampling. Hour Number of defectives 1 2 2 4 3 6 4 0 5 12 6 2 7 6 8 8 9 9 10 13 11 15 12 4 13 5 14 6 15 7 16 9 17 0 18 8 19 3 20 12 21 11 22 13 23 0 24 3 What control charting would you use [ Select ] What is the sample size [ Select ] What is the upper control limit [ Select ] and lower control limit [ Select ] of this Oreo cookie line Was the Oreo production line in control [ Select ] , if not, what hour did Jack find excessive defects from the production line [ Select ]

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
"how does lena finally defeat the robots? ” this question will best be used to describe the story’s exposition. rising action. climax. falling action.
Answers: 3
question
Mathematics, 21.06.2019 15:00
Need ! give step by step solutions on how to solve number one \frac{9-2\sqrt{3} }{12+\sqrt{3} } number two x+4=\sqrt{13x-20} number three (domain and range) f(x)=2\sqrt[3]{x} +1
Answers: 2
question
Mathematics, 21.06.2019 17:30
Choose the number sentence that shows the identity property of addition. a. 122 = 61 + 61 b. 62 = 1 + 61 c. 61 = 0 + 61
Answers: 1
question
Mathematics, 21.06.2019 17:50
The length and width of a rectangle are consecutive even integers the area of the rectangle is 120 squares units what are the length and width of the rectangle
Answers: 1
You know the right answer?
Jack started his production supervisor job at Nabisco Bakery Plant in Maxton, NC, then got promoted...
Questions
question
Social Studies, 31.07.2019 18:30