subject
Mathematics, 30.10.2021 05:50 SmokeyRN

The copy center has a job order that requires 500 pages of white paper and 200 pages of pink paper. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. Suppose the copy center only did jobs exactly like this one (500 white, 200 pink). What would the cycle time be

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Its due ! write an equation in which the quadratic expression 2x^2-2x 12 equals 0. show the expression in factored form and explain what your solutions mean for the equation. show your work.
Answers: 1
question
Mathematics, 21.06.2019 17:00
Tiffany drives 285,120 feet before lunch and 628,320 feet after lunch. about how many kilometers does she drive all together
Answers: 1
question
Mathematics, 21.06.2019 17:30
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Billy plotted βˆ’3 4 and βˆ’1 4 on a number line to determine that βˆ’3 4 is smaller than βˆ’1 4 is he correct? explain why or why not?
Answers: 3
You know the right answer?
The copy center has a job order that requires 500 pages of white paper and 200 pages of pink paper....
Questions