subject
Mathematics, 25.10.2021 22:40 Astudent333

A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.730 inches or greater than 0.770 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.04 inches. What is the probability that the manufacturing line will be shut down unnecessarily

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
What is the measure of angle afe? 79 81 91 99
Answers: 3
question
Mathematics, 21.06.2019 16:50
Consider circle h with a 3 centimeter radius. if the length of minor arc what is the measure of zrst?
Answers: 2
question
Mathematics, 21.06.2019 17:00
How do i do this activity, is appreciated
Answers: 1
question
Mathematics, 21.06.2019 19:10
Which equation results from adding the equations in this system? x+6y=9 and -x+2y=-15
Answers: 1
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Questions
question
Mathematics, 01.02.2022 19:50
question
Biology, 01.02.2022 20:00
question
Social Studies, 01.02.2022 20:00
question
Business, 01.02.2022 20:00