subject
Mathematics, 23.10.2021 22:50 zedanabdul198

An offshore wind turbine is 3km off the shoreline. The power operator is 7 km down the coast to the east of the turbine. For the electricity generated by the turbine to make its way to the power operator, the turbine must be connected to distribution lines and then to the network transmission lines located at the power operator. If laying the distribution lines cost twice times as much under water as it does on land, what path should the distribution lines follow in order to minimize the cost?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Your client has saved $1,860 for a down payment on a house. a government loan program requires a down payment equal to 3% of the loan amount. what is the largest loan amount that your client could receive with this program
Answers: 3
question
Mathematics, 21.06.2019 18:10
Points a, b, and c form a triangle. complete the statements to prove that the sum of the interior angles of triangle abc is 180
Answers: 1
question
Mathematics, 21.06.2019 19:00
In trapezoid abcd, ac is a diagonal and ∠abc≅∠acd. find ac if the lengths of the bases bc and ad are 12m and 27m respectively.
Answers: 3
question
Mathematics, 21.06.2019 21:00
Which zero pair could be added to the function f(x) = x2 + 12x + 6 so that the function can be written in vertex form? o 3, -3o 6,629,-936, 36
Answers: 3
You know the right answer?
An offshore wind turbine is 3km off the shoreline. The power operator is 7 km down the coast to the...
Questions
question
Biology, 05.11.2020 04:50
question
Mathematics, 05.11.2020 04:50
question
Mathematics, 05.11.2020 04:50
question
Social Studies, 05.11.2020 04:50