subject
Mathematics, 09.10.2021 22:00 papasully1

You are the head of a building department . Your department is making final inspections of two types of new commercial buildings --gas stations and restaurants . Final inspections involve the work of three separate inspectors : a plumbing inspector , an electrical inspector , and a building inspector . The plumbing inspector requires 4 hours to inspect a gas station and 2 hours to inspect a restaurant . The electrical inspector requires 2 hours to inspect a gas station and 6 hours to inspect a restaurant . The building inspector requires 4 hours to inspect a gas station and 6 hours to inspect a restaurant . Considering the time required for other duties , the plumbing inspector has 28 hours a week available for inspections ; the electrical inspector has 30 hours available and the building inspector has 36 hours available . You want to inspect as many commercial buildings as possible each week . Set up this problem as a linear programming problem .

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
Empty box + box + empty box fill in the box is equal to 30 how
Answers: 2
question
Mathematics, 21.06.2019 19:00
{0,1,2,3,4,5,6,20,21,22,23,24,25} the distribution is considered to be: skewed the right, skewed the left, not skewed?
Answers: 1
question
Mathematics, 22.06.2019 01:00
Libby built a fence that was 56 \text { feet}56 feet long over 44 days. she built the same length of fence each day. how many inches of fence did libby build each day?
Answers: 1
question
Mathematics, 22.06.2019 02:00
Zahra wants the equation below to have an infinite number of solutions when the missing number is placed in the box.
Answers: 2
You know the right answer?
You are the head of a building department . Your department is making final inspections of two types...
Questions
question
Mathematics, 03.03.2020 05:50
question
Mathematics, 03.03.2020 05:50