subject
Mathematics, 01.10.2021 20:10 andydiaz1227

To manufacture an automobile requires painting and polishing Epsilon Motor Company produces three types of cars, the Delta Beta and the Sigma Each Delta 7 hours painting 2 hours for drying, and hours for polishing A requires 13 hours for paintinghours for drying and 5 hours for polishing and a Sigma requires 9 hours for painting1 hour for drying, and 2 hours for polishing the company has 308 hours for painting 67 hours for drying and 107 hours for polishing per month how many of each type of car are produced?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
He expression 2(l + w) is used to calculate the perimeter of a rectangle, where l is length and w is width. if the length is fraction 2 over 3 unit and the width is fraction 1 over 3 unit, what is the perimeter of the rectangle in units? fraction 2 over 3 unit 1 unit 1fraction 2 over 3 units 2 units
Answers: 3
question
Mathematics, 21.06.2019 16:30
Which value is not a solution of 8x^3 – 1 = 0
Answers: 1
question
Mathematics, 22.06.2019 03:30
Is a triangle with sides of length 6ft, 21 ft, 23 ft. a right triangle?
Answers: 1
question
Mathematics, 22.06.2019 03:30
The length of a rectangle is 5 times the width. if the perimeter is to be greater than 36 meters. what are the possible values for the width?
Answers: 1
You know the right answer?
To manufacture an automobile requires painting and polishing Epsilon Motor Company produces three ty...
Questions