subject
Mathematics, 08.09.2021 18:30 AariyahFennell

John Piotrowski assembled a total of 642 circuit boards in 3 days of work. During the first 2 days, he assembled 211 and 208 circuit boards,
respectively. How many did he assemble the last day?
Your answer

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The height of a flare fired from the deck of a ship in distress can be modeled by h(t)= -2(8t^2-52t-28), where h is the height of the flare above water and t is the time in seconds. a. find the time it takes the flare to hit the water.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Who long does it take to drive 150 miles at 45 miles per hour
Answers: 2
question
Mathematics, 21.06.2019 23:40
Typically a point in a three dimensional cartesian coordinate system is represented by which of the following answers in the picture !
Answers: 1
question
Mathematics, 22.06.2019 00:00
Cody ran nine miles on his first day of training. the next day he ran 1/8 that distance. how far did he run the second day?
Answers: 2
You know the right answer?
John Piotrowski assembled a total of 642 circuit boards in 3 days of work. During the first 2 days...
Questions
question
Mathematics, 12.03.2021 21:00
question
Mathematics, 12.03.2021 21:00