A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. Optimistic Most Probable Pessimistic Activity Time (hr) Time (hr) Time (hr) Floor sanding 3 4 5 Floor buffing 1 2 3 Paint mixing 0.5 1 1.5 Wall painting 1 2 9 Ceiling painting 1 5.5 7 ​ Construct the PERT/CPM network for this problem on a rough paper. What is the expected completion time of this project? What is the probability that the project can be completed within 9 hr.?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Jayne is studying urban planning and finds that her town is decreasing in population by 3% each year the population of her town is changing by a constant rate
Answers: 2
question
Mathematics, 21.06.2019 19:20
Suppose that a households monthly water bill (in dollars) is a linear function of the amount of water the household uses (in hundreds of cubic feet, hcf). when graphed, the function gives a line with slope of 1.65. if the monthly cost for 13 hcf is $46.10 what is the monthly cost for 19 hcf?
Answers: 3
question
Mathematics, 21.06.2019 22:30
Convert (-3,0) to polar form. a. (3,0’) b. (-3,180’) c. (3,180’) d. (3,360’)
Answers: 1
question
Mathematics, 21.06.2019 23:00
I'm at a bookstore with $\$35$ in my pocket and a $20\%$-off coupon. what is the cost of the most expensive book i can buy with my money and the coupon? (assume that there are books of every possible price in the bookstore. it's a large bookstore! )
Answers: 1
You know the right answer?
A project consists of five activities. Naturally the paint mixing precedes the painting activities....