subject
Mathematics, 07.09.2021 03:00 joheste2831

Solve. Complete the table for the consecutive integers. Next Integers
First Integer
Integer:
Х
Indicated Sum
Sum of the three consecutive integers,
simplified:
X+ 1
X + 2
Complete the statement below.
Sum of the three consecutive integers, simplified:
(Type an expression using x as the variable.)


Solve. Complete the table for the consecutive integers.

Next Integers
First Integer
Integer:
Х
In

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 22.06.2019 00:20
Nthe opening scene of the movie raiders of the lost ark, indiana jones replaces a golden statue with a bag of sand. the platform on which the statue is placed is designed to detect the mass of the statue. if the bag of sand has a different mass than the statue, then a mechanism triggers and destruction ensues. the density of gold is about 20\text{ g/cm}^320 g/cm 3 20, space, g, slash, c, m, start superscript, 3, end superscript. the density of sand can be estimated at 2.5\text{ g/cm}^32.5 g/cm 3 2, point, 5, space, g, slash, c, m, start superscript, 3, end superscript. the gold statue can be modeled as a cylinder with height 25\text{ cm}25 cm25, space, c, m and radius 8\text{ cm}8 cm8, space, c, m. in terms of \piπpi, what is the mass of sand indiana jones needs to avoid triggering the mechanism?
Answers: 2
question
Mathematics, 22.06.2019 01:30
Asample of 200 rom computer chips was selected on each of 30 consecutive days, and the number of nonconforming chips on each day was as follows: the data has been given so that it can be copied into r as a vector. non.conforming = c(10, 15, 21, 19, 34, 16, 5, 24, 8, 21, 32, 14, 14, 19, 18, 20, 12, 23, 10, 19, 20, 18, 13, 26, 33, 14, 12, 21, 12, 27) #construct a p chart by using the following code. you will need to enter your values for pbar, lcl and ucl. pbar = lcl = ucl = plot(non.conforming/200, ylim = c(0,.5)) abline(h = pbar, lty = 2) abline(h = lcl, lty = 3) abline(h = ucl, lty = 3)
Answers: 3
question
Mathematics, 22.06.2019 02:00
If p(x) is the total value of the production when there are x workers in a plant, then the average productivity of the workforce at the plant is a(x) = p(x) x . (a) find a'(x). a'(x) = xp'(x) − p(x) x a'(x) = xp'(x) − p(x) x2 a'(x) = p'(x) − p(x) x a'(x) = xp'(x) − p'(x) x2 a'(x) = p'(x) − xp(x) x2 why does the company want to hire more workers if a'(x) > 0? a'(x) > 0 ⇒ a(x) is ; that is, the average productivity as the size of the workforce increases. (b) if p'(x) is greater than the average productivity, which of the following must be true? p'(x) − xp(x) > 0 p'(x) − xp(x) < 0 xp'(x) − p'(x) > 0 xp'(x) − p(x) < 0 xp'(x) − p(x) > 0
Answers: 2
question
Mathematics, 22.06.2019 02:00
The line plot below represents the number of letters written to overseas pen pals by the students at the waverly middle school.each x represents 10 students. how many students wrote more than 6 and fewer than 20 letters. a.250 b.240 c.230 d.220
Answers: 3
You know the right answer?
Solve. Complete the table for the consecutive integers. Next Integers
First Integer
In...
Questions
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40
question
Mathematics, 09.04.2021 23:40