subject
Mathematics, 28.08.2021 15:40 spazzinchicago

A firm manufactures two types of couplings, A and B, each of which requires processing time on lathes, grinders and polishers. The machine times needed for each type of coupling are given in the table Coupling type Time required (hours) Lathe Grinder Polisher The total machine time available is 250hours on lathes, 310 hours on grinders and 160hours on polishers. The net profit per coupling of type A is $9 and of type B is S10. Formulate a linear model from the above information. Using the model, determine a) The number of each type to be produced to maximize profit
b) The maximum profit

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
Aline parallel to a triangle's side splits ab into lengths of x - 5 and x + 2. the other side, ac, is split into lengths of x and x + 12. what is the length of ac? a) 12 b) 24 c) 36 d)
Answers: 1
question
Mathematics, 21.06.2019 17:00
Simone claims the initial value and y-intercept are the same thing on a graph. is she correct? if you know that a line has a slope of and a y-intercept of 7, what is the equation for that line in slope-intercept form?
Answers: 1
question
Mathematics, 21.06.2019 18:00
Which shows the correct solution of the equation 1/2a+2/3b=50, when b=30?
Answers: 1
question
Mathematics, 21.06.2019 19:00
What is the frequency of the sinusoidal graph?
Answers: 2
You know the right answer?
A firm manufactures two types of couplings, A and B, each of which requires processing time on lathe...
Questions
question
Mathematics, 27.12.2019 09:31
question
Mathematics, 27.12.2019 09:31
question
Mathematics, 27.12.2019 09:31