subject
Mathematics, 02.08.2021 22:00 gallowayryan19

A dam is said to be designed for a N-year flood if it has a capacity that will be exceeded with probability 1/N in any given year. Assume that successive annual floods are independent. a. An agency designs 10 dams at widely scattered locations for their respective 500-year floods. If occurrences of floods at each of the dams are mutually independent, what is the probability that two or more dams will fail at least once within the next 50 years?
b. In 1999, the 50-year flood was estimated to be a particular size. In the next 10 years, three floods were observed in excess of this size. If the original estimate was correct, what is the probability of such an observation?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:40
Which compound inequality could be represented by the graph?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Pepe and leo deposits money into their savings account at the end of the month the table shows the account balances. if there pattern of savings continue and neither earns interest nor withdraw any of the money , how will the balance compare after a very long time ?
Answers: 1
question
Mathematics, 21.06.2019 22:10
2. using calculations based on a perpetual inventory system, determine the inventory balance altira would report in its august 31, 2021, balance sheet and the cost of goods sold it would report in its august 2021 income statement using the average cost method. (round "average cost per unit" to 2 decimal places.)
Answers: 1
question
Mathematics, 21.06.2019 22:30
Solve for x. −3/4(x+2)=6 enter your answer in the box
Answers: 1
You know the right answer?
A dam is said to be designed for a N-year flood if it has a capacity that will be exceeded with prob...
Questions
question
Mathematics, 25.06.2020 03:01
question
Mathematics, 25.06.2020 03:01