subject
Mathematics, 01.08.2021 06:30 KrazyBird0912

The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires 5 hours to assembly and 12 finishing work units for finishing work, the home model requires 2 hours to assemble and 6 finishing work units for finishing. The maximum number of assembly hours available is 50 per day, and the maximum number of finishing hours available is 132 per day. Let
x
= the number of office model shredders produced per day and
y
= the number of home model shredders produced per day.

Write the system of inequalities that represents the maximum number of shredders that can be produced in one day.

NOTE: 4 inequalities are expected.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:50
Graph y β‰₯ -x^2 - 1. click on the graph until the correct graph appears.
Answers: 1
question
Mathematics, 21.06.2019 18:00
Name each raycalculation tip: in ray "ab", a is the endpoint of the ray.
Answers: 2
question
Mathematics, 21.06.2019 21:00
Someone me i need with this stuff
Answers: 2
question
Mathematics, 21.06.2019 21:20
Amajor grocery store chain is trying to cut down on waste. currently, they get peaches from two different distributors, whole fruits and green grocer. out of a two large shipments, the manager randomly selects items from both suppliers and counts the number of items that are not sell-able due to bruising, disease or other problems. she then makes a confidence interval. is there a significant difference in the quality of the peaches between the two distributors? 95% ci for pw-pg: (0.064, 0.156)
Answers: 3
You know the right answer?
The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires...
Questions
question
Mathematics, 29.09.2019 20:30