Mathematics, 09.07.2021 03:00 untouchedyannaa

The time between surface finish problems in a galvanizing process is exponentially distributed with a mean of 41 hours. A single plant operates three galvanizing lines that are assumed to operate independently. Round your answers to four decimal places (e. g. 98.7654). (a) What is the probability that none of the lines experiences a surface finish problem in 41 hours of operation?
(b) What is the probability that all three lines experience a surface finish problem between 24 and 41 hours of operation?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Asequence {an} is defined recursively, with a1 = 1, a2 = 2 and, for n > 2, an = an-1 an-2 . find the term a241
Answers: 2
question
Mathematics, 21.06.2019 17:30
Apublic library wants to place 4 magazines and 9 books on each display shelf. the expression 4s+9s represents the total number of items that will be displayed on s shelves. simplify the expression
Answers: 2
question
Mathematics, 21.06.2019 18:00
Tickets to a science exposition cost $5.75 each for studentd and $7.00 for adults.how many students and adults went if the ticket charge was $42.75
Answers: 1
question
Mathematics, 21.06.2019 20:00
What is the ratio of the length of an object in yards to the length of the same object in miles?
Answers: 3
You know the right answer?
The time between surface finish problems in a galvanizing process is exponentially distributed with...