A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows. Activity Activity Time (weeks) Probability A 5 0.30 6 0.35 7 0.20 8 0.15 B 3 0.15 5 0.60 7 0.25 C 10 0.10 12 0.25 14 0.35 16 0.25 18 0.05 D 8 0.65 10 0.35 (a) Construct a spreadsheet simulation model to estimate the average length of the project (in weeks) and the standard deviation of the project length. (Use at least 1,000 trials. Round you answers to one decimal place.) average weeks standard deviation weeks (b) What is the estimated probability that the project will be completed in 35 weeks or less

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
Empty box + box + empty box fill in the box is equal to 30 how
Answers: 2
question
Mathematics, 21.06.2019 18:50
Which expression shows the sum of the polynomials with like terms grouped together
Answers: 2
question
Mathematics, 21.06.2019 19:10
Which ordered pair is a solution of the equation? y + 5 = 2(2+1) choose 1 answer ® only (5,10 ® only (-1,-5) © both (5, 10) and (-1,-5) 0 neither
Answers: 1
question
Mathematics, 22.06.2019 00:10
Is the number 128.439 a rational number
Answers: 2
You know the right answer?
A project has four activities (A, B, C, and D) that must be performed sequentially. The probability...
Questions
question
History, 01.02.2020 20:44