subject
Mathematics, 30.06.2021 21:20 ssalusso7914

Collinear points Point B is between A and C if A, B, and C are collinear and
the equation AB + BC = AC is true, where AB, BC, and AC are
1.
the distances between points A and B, B and C, and A and C,
respectively
2. A set of two or more points all on the same line.
Ray
3. A set of two or more points all on the same plane.
Length of a segment
4. The set of all possible points.
Line Segment
5. A line or segment that intersects the segment at its midpoint.
Midpoint of a segment
Bisector of a segment
6. The distance between the endpoints of a segment.
The set of two different endpoints and all points between
7.
them
Opposite rays
Coplanar points
The point on a segment that divides the segment into two
8.
equal segments
Ray BA and ray BC are opposite rays if A, B, and C are
9. collinear and B (the endpoint of both rays) is between A and
C С
10
A ray, AB. is the set of points beginning at point A and going
infinitely in the direction of point B.
Space
Betweenness of points


Collinear points

Point B is between A and C if A, B, and C are collinear and
the equation AB + BC

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
A, b, c, and d have the coordinates (-8, 1), (-2, 4), (-3, -1), and (-6, 5), respectively. which sentence about the points is true? a. a, b, c, and d lie on the same line. b. and are perpendicular lines. c. and are parallel lines. d. and are intersecting lines but are not perpendicular. e. and are parallel lines.
Answers: 1
question
Mathematics, 21.06.2019 20:20
Each person in an it department of 25 people works on at least one of 3 major projects: system security, program implementation, platform development. 10 people work on system security, 13 work on program implementation, and 12 work on platform development. 4 people work on system security and platform development, 5 people work on program implementation and platform development, and 2 people work on all three projects. how many people work on system security and program implementation?
Answers: 1
question
Mathematics, 21.06.2019 23:30
Select the correct answer and solve for y
Answers: 2
question
Mathematics, 21.06.2019 23:30
The scatterplot represents the total fee for hours renting a bike. the line of best fit for the data is y = 6.855x + 10.215. which table shows the correct residual values for the data set?
Answers: 1
You know the right answer?
Collinear points Point B is between A and C if A, B, and C are collinear and
the equation AB...
Questions
question
Mathematics, 30.03.2021 18:30
question
Mathematics, 30.03.2021 18:30
question
Arts, 30.03.2021 18:30
question
Mathematics, 30.03.2021 18:30