subject
Mathematics, 21.06.2021 21:40 sara7946

Middlefield Motors is evaluating project Z. The project would require an initial investment of 78,000 dollars that would be depreciated to 14,500 dollars over 8 years using straight-line depreciation. The first annual operating cash flow of 17,500 dollars is expected in 1 year, and annual operating cash flows of 17,500 dollars are expected each year forever. Middlefield Motors expects the project to have an after-tax terminal value of 309,000 dollars in 5 years. The tax rate is 20 percent. What is (X+Y)/Z if X is the project’s relevant expected cash flow for NPV analysis in year 5, Y is the project’s relevant expected cash flow for NPV analysis in year 6, and Z is the project’s relevant expected cash flow for NPV analysis in year 4? Round your answer to 2 decimal places (for example, 2.89, 0.70, or 1.00)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Driving 75 mph, it takes alicia 2 hours to reach the airport to go on a vacation. it then takes her 4 hours to get to her destination with the jet traveling at a speed of 400 mph. how many miles does alicia travel to get to her destination?
Answers: 2
question
Mathematics, 21.06.2019 22:20
The school track has eight lanes. each lane is 1.25 meters wide. the arc at each end of the track is 180. the distance of the home straight and the radii for the arcs in the 1st 4 lanes are given. s=85m r1=36.5m r2=37.75m r3=39m r4=40.25m part one: find the radii of lanes 5 through 8 of the track. show your work. part two: if max ran around lane one, how far did he run? show your work and explain your solution. part three: max wants to run a total of three laps around the track, choose two additional lanes (2-8) for him to run and find the distance around those two lanes. show your work and round to the hundredths. part 4: based on your lane choices in part three, what was the total distance max ran in the three laps around the track?
Answers: 2
question
Mathematics, 22.06.2019 00:00
To convert celsius temperatures to fahrenheit, you can use the expression (c + 32). tom says that another way to write this expression is c + 32. what error did tom make?
Answers: 3
question
Mathematics, 22.06.2019 04:00
The number of students who ride a school bus is 110% of the number of students who walk. how many students ride the school bus?
Answers: 1
You know the right answer?
Middlefield Motors is evaluating project Z. The project would require an initial investment of 78,00...
Questions
question
Arts, 08.12.2020 20:00
question
Chemistry, 08.12.2020 20:00
question
History, 08.12.2020 20:00
question
Engineering, 08.12.2020 20:00
question
Chemistry, 08.12.2020 20:00
question
Mathematics, 08.12.2020 20:00
question
Physics, 08.12.2020 20:00
question
Mathematics, 08.12.2020 20:00