Mathematics, 18.06.2021 05:10 sampurple123

A jean manufacturer makes three types of jeans, each of which goes through three manufacturing phases: cutting, sewing, and finishing. The number of minutes each type of product requires in each of the three phases is given below: Jean Cutting Sewing Finishing
I 8 12 4
II 12 18 8
III 18 24 12

There are 5200 minutes of cutting time, 6000 minutes of sewing time, and 2200 minutes of finishing time each day. The company can sell all the jeans it makes and makes a profit of $4 on each Jean I, $4.50 on each Jean II, and 6 on each Jean III.

Required:
a. What number of jeans in each category should be made each day to maximize profits?
b. Formulate a linear programming problem that models the problem given above. Be sure to identify all variables used.
c. Analyze the solution.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Factorize: x^2+8x+10 i just solved it but i don't know if the process is correct
Answers: 3
question
Mathematics, 21.06.2019 14:30
Given f(t) = 282 - 53 +1, determine the function value f(2). do not include f(z) = in your answer
Answers: 1
question
Mathematics, 21.06.2019 16:30
Add the two expressions 3.8b - 7 and 2.9b + 9 enter your answer in simplified form
Answers: 1
question
Mathematics, 21.06.2019 19:30
When x = 3 and y = 5, by how much does the value of 3x2 – 2y exceed the value of 2x2 – 3y ?
Answers: 2
You know the right answer?
A jean manufacturer makes three types of jeans, each of which goes through three manufacturing phase...
Questions
question
English, 17.02.2021 01:40
question
History, 17.02.2021 01:40
question
Mathematics, 17.02.2021 01:40
question
Mathematics, 17.02.2021 01:40