subject
Mathematics, 17.06.2021 20:40 famouzgal

A quality control technician samples circuit boards and records the number that are defective. Of 240 boards sampled, 8 are found to be defective. The technician reports that 30% of the boards are defective, based on the following work: Which best explains any error the technician may have made?

- There is no error. The technician’s calculations are correct.
- The technician divided in an incorrect order.
- The technician did not convert the answer to a decimal.
- The technician’s sample was not large enough to convert to a percentage.
- The technician did not multiply the answer by 100 to convert it to a percentage.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Find the value of the variable and the length of each secant segment.
Answers: 2
question
Mathematics, 21.06.2019 18:10
which of the following sets of data would produce the largest value for an independent-measures t statistic? the two sample means are 10 and 20 with variances of 20 and 25 the two sample means are 10 and 20 with variances of 120 and 125 the two sample means are 10 and 12 with sample variances of 20 and 25 the two sample means are 10 and 12 with variances of 120 and 125
Answers: 2
question
Mathematics, 21.06.2019 21:00
What is the unit rate of, 75% high fiber chimp food to 25% high protein chimp food.
Answers: 1
question
Mathematics, 22.06.2019 00:40
Calculate the annual effective interest rate of a 12 % nominal annual interest rate compound monthly
Answers: 1
You know the right answer?
A quality control technician samples circuit boards and records the number that are defective. Of 24...
Questions
question
Mathematics, 10.02.2021 01:30
question
Biology, 10.02.2021 01:30
question
Mathematics, 10.02.2021 01:30
question
Physics, 10.02.2021 01:30