subject
Mathematics, 15.06.2021 19:30 smokemicpot

In a pacemaker factory, all pacemakers must go through a rigorous quality assurance check before being shipped. The table shows the results
of the quality assurance checks. The factory can submit a complaint if the
inspector is correct less than 80% of the time. Find the probability that
the inspector will be successful on any given pacemaker check, rounding
your decimal answer to three decimal places. Also: Can the factory submit
a complaint about this inspector?


In a pacemaker factory, all pacemakers must go through a rigorous

quality assurance check before

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Thales was an ancient philosopher familiar with similar triangles. one story about him says that he found the height of a pyramid by measuring its shadow and his own shadow at the same time. if the person is 5-ft tall, what is the height of the pyramid in the drawing?
Answers: 3
question
Mathematics, 21.06.2019 18:50
Find the center and the radius of the circle with the equation: x^2-2x+y^2+4y+1=0?
Answers: 1
question
Mathematics, 21.06.2019 19:00
For what value of (y) is 3^3/3^y =1/9
Answers: 1
question
Mathematics, 21.06.2019 19:00
Can someone me out here number 4 plz
Answers: 1
You know the right answer?
In a pacemaker factory, all pacemakers must go through a rigorous quality assurance check before be...
Questions
question
Mathematics, 21.01.2021 23:50
question
Mathematics, 21.01.2021 23:50
question
Mathematics, 21.01.2021 23:50