subject
Mathematics, 14.06.2021 15:30 JeroMii

In a manufacturing process the assembly line speed (feet per minute) with thought to affect the number of defective parts found during the inspection process. To test this theory, managers devised a situation in which the same batch of pots was inspected visually at a variety of line speeds. They collected the following data. Line Speed Number of defective parts found
20 21
20 19
40 15
30 16
60 14
40 17

Required:
a. Develop the estimated regression equation that relates line speed to the number of defective parts found.
b. At α= 0.05 level of significance, determine whether line speed and number of defective parts found are related.
c. Did the estimated regression equation provide a good fit to the data?
d. Develop a 95% confidence interval to predict the mean number of defective parts for a line speed of 50 feet per minute.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
What is the square root of 45? (step by step working plz)
Answers: 1
question
Mathematics, 21.06.2019 16:00
Three cylinders have a height of 8 cm. cylinder 1 has a radius of 1 cm. cylinder 2 has a radius of 2 cm. cylinder 3 has a radius of 3 cm. find the volume of each cylinder ( ! : ”0 )
Answers: 3
question
Mathematics, 21.06.2019 23:40
Cos^2x+cos^2(120°+x)+cos^2(120°-x)i need this asap. pls me
Answers: 1
question
Mathematics, 22.06.2019 01:00
Arrange the steps to solve this system of linear equations in the correct sequence. x + y = -2 2x – 3y = -9 tiles subtract 3x + 3y = -6 (obtained in step 1) from 2x – 3y = -9 (given) to solve for x. substitute the value of x in the first equation (x + y = -2) to get y = 1. the solution for the system of equations is (-3, 1). x = -15 the solution for the system of equations is (-15, 13). add 3x + 3y = -6 (obtained in step 1) to 2x – 3y = -9 (given), and solve for x. x = -3 substitute the value of x in the first equation (x + y = -2) to get y = 13. multiply the first equation by 3: 3(x + y) = 3(-2) 3x + 3y = -6.
Answers: 1
You know the right answer?
In a manufacturing process the assembly line speed (feet per minute) with thought to affect the numb...
Questions
question
Mathematics, 06.10.2019 07:30
question
Mathematics, 06.10.2019 07:30