1) A statistical process control (SPC) system is a method of measuring the number of defects in a product. A quality control manager is starting a new SPC program at a base
cost of $25,000. The manager can choose to add an additional personal computer (PC) to
a department at a cost of $2000 per department.

a) Write a linear model that gives the total cost as a function of the number of
departments that will add an additional PC.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Find the equation of a line whose slope is 2/5 and y- intercept is 2.write your answer in the form 1) ax+by+c=02) x/a+y/b=1
Answers: 1
question
Mathematics, 21.06.2019 20:00
Question 3 (essay worth 10 points) (03.06 mc) part a: max rented a motorbike at $465 for 5 days. if he rents the same motorbike for a week, he has to pay a total rent of $625. write an equation in the standard form to represent the total rent (y) that max has to pay for renting the motorbike for x days. (4 points) part b: write the equation obtained in part a using function notation. (2 points) part c: describe the steps to graph the equation obtained above on the coordinate axes. mention the labels on the axes and the intervals. (4 points)
Answers: 1
question
Mathematics, 21.06.2019 20:30
Cody was 165cm tall on the first day of school this year, which was 10% taller than he was on the first day of school last year.
Answers: 1
question
Mathematics, 21.06.2019 21:00
Ireally need subtract and simplify.(-y^2 – 4y - 8) – (-4y^2 – 6y + 3)show your work, ! i will mark you brainliest but you have to show your work.
Answers: 1
You know the right answer?
1) A statistical process control (SPC) system is a method of measuring the number of defects in a p...
Questions
question
Mathematics, 10.04.2020 18:59
question
Geography, 10.04.2020 18:59
question
Mathematics, 10.04.2020 18:59