The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires 4 hours to assembly and 6 finishing work units for finishing work, the home model requires 3 hours to
assemble and 6 finishing work units for finishing. The maximum number of assembly hours available is 72
per day, and the maximum number of finishing hours available is 132 per day.
Let 2 = the number of office model shredders produced per day and y = the number of home model
shredders produced per day.
Write the system of inequalities that represents the maximum number of shredders that can be produced in
one day.
NOTE: 4 inequalities are expected.
572
< 132

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Natasha spent 1 1/2 hours on the beach. she fell asleep for 3/4 of the time she was on the beach and then woke up with a terrible sunburn.how many hours was natasha asleep on the beach?
Answers: 2
question
Mathematics, 21.06.2019 15:30
The coordinates of a, b, and c in the diagram are a(p,4), b(6,1), and c(9,q). which equation correctly relates p and q? hint: since is perpendicular to , the slope of Ɨ the slope of = -1. a. p - q = 7 b. q - p = 7 c. -q - p = 7 d. p + q = 7
Answers: 3
question
Mathematics, 22.06.2019 00:30
Y= a(x-3)squared-1 what is the value of a
Answers: 1
question
Mathematics, 22.06.2019 02:00
Mr. thompson took five of his children to the bowling alley the cost for children 12 and older is 350 the cost of four children under 12 inch to 25 he spent a total of 1625 how many of his children are 12 and order
Answers: 1
You know the right answer?
The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires...
Questions
question
Mathematics, 19.09.2019 17:40
question
History, 19.09.2019 17:40
question
Mathematics, 19.09.2019 17:40