If 4 labourers can finish a job in 6days how long would it take 3men to do the job

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
How can you find the mean absolute deviation (mad) for this set of data?
Answers: 3
question
Mathematics, 21.06.2019 23:00
The length of an intercepted arc of a central angle of a circle is 4 cm. if the radius of the circle is 5 cm what is the measurement of the central angle to the nearest whole degree
Answers: 2
question
Mathematics, 21.06.2019 23:30
The number of members f(x) in a local swimming club increased by 30% every year over a period of x years. the function below shows the relationship between f(x) and x: f(x) = 10(1.3)xwhich of the following graphs best represents the function? graph of f of x equals 1.3 multiplied by 10 to the power of x graph of exponential function going up from left to right in quadrant 1 through the point 0, 0 and continuing towards infinity graph of f of x equals 10 multiplied by 1.3 to the power of x graph of f of x equals 1.3 to the power of x
Answers: 1
question
Mathematics, 22.06.2019 02:00
Write the component forms of vectors u and v, shown in the graph, and find v − 2u. u= (< -3, -2> , < -3, -1> , < -2, -2> , < -2, -1> ) v= (< -5, 1> , -4, 0> , < 0, -4> , < 1, -5> ) v-2u= (< 5, 3> , < 0, 4> , < 4, 0> , < 5, -3>
Answers: 3
You know the right answer?
If 4 labourers can finish a job in 6days how long would it take 3men to do the job
​...
Questions