subject
Mathematics, 03.06.2021 06:50 hcpsharrissy2952

A building contractor is to dig a foundation 48 feet​ long 15 feet​ wide, and 6feet deep. The contractor pays ​$20 per load for trucks to remove the dirt. Each truck holds 8 cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 22.06.2019 00:00
Percy rides his bike 11.2 miles in 1.4 hours at a constant rate. write an equation to represent the proportional relationship between the number of hours percy rides, x,and the distance in miles, y, that he travels.
Answers: 1
question
Mathematics, 22.06.2019 00:30
Jennifer taking a quiz and has answered 13 questions so far. if there are 25 questions on jennifer test, how many questions does she have left to answer
Answers: 1
question
Mathematics, 22.06.2019 00:30
Jan accidently ran 7 minutes longer than he was supposed to. write an expression for the total amount of time jan ran if she was supposed to run m minutes
Answers: 1
question
Mathematics, 22.06.2019 01:30
Ineed with question three. i don't understand how i'm supposed to achieve 3 marks.
Answers: 2
You know the right answer?
A building contractor is to dig a foundation 48 feet​ long 15 feet​ wide, and 6feet deep. The contra...
Questions
question
Mathematics, 06.11.2020 20:30
question
History, 06.11.2020 20:30
question
Geography, 06.11.2020 20:30
question
Mathematics, 06.11.2020 20:30