An automation project has the following activities and related data: Activity Time (Weeks) Activity Immediate Predecessor Most Optimistic (a) Most likely (m) Most Pessimistic (c) Crash Cost ($000) per week Maximum Crashable weeks A None 4 6 8 1 1 B None 4 5 6 5 1 C A 1 2 3 2 2 D A 1 4 7 4 2 E B 1 3 5 2 1 F B 4 5 12 3 1 G C, E 8 9 16 3 2 H D, F 2 6 16 2 1
13a. Compute the Expected Value E(t) and Variance V(t) for all activities. (5 points deducted for any error).
13b. There are three critical paths: ACG, BEG, and BFH, all with expected project completion time E(T)=18 weeks. Compute the variance of project completion time for each path. (5 points deducted for any error)
14. We will assume that the project completion time T is normally distributed with mean E(T)=18 weeks, and variance V(T) approximated by the maximum of the variances of the three individual critical paths.
14a. Compute the probability that the project can be completed in 19 weeks.
14b. Determine the time X in weeks for which there is a 90% probability that the project can be completed on or before X.
14c. List all alternatives and the respective costs for shortening the project by one week and identify the best alternative that has the minimum cost (5 points deducted for each missing or incorrect alternative).
15a. Formulate the linear program for minimizing the cost of shortening the project by one week. (5 points deducted for any missing part of the formulation
15b. Solve 15a with an LP software.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Translate this phrase into an algebraic expression. 21 more than twice goran's savings use the variable g to represent goran's savings. need to know fast.
Answers: 1
question
Mathematics, 21.06.2019 18:30
Need an artist designed a badge for a school club. figure abcd on the coordinate grid below shows the shape of the badge: the badge is enlarged and plotted on the coordinate grid as figure jklm with point j located at (2, -2) and point m is located at (5, 4). which of these could be the coordinates for point l? a. (2, 4) b. (8, 4) c. (5, 1) d. (5, 7)
Answers: 2
question
Mathematics, 21.06.2019 19:30
You are designing a rectangular pet pen for your new baby puppy. you have 30 feet of fencing you would like the fencing to be 6 1/3 feet longer than the width
Answers: 1
question
Mathematics, 21.06.2019 20:30
8. kelly wants to buy a magazine that is $25. later the magazine was marked up an additional 20%. what is the new price?
Answers: 1
You know the right answer?
An automation project has the following activities and related data: Activity Time (Weeks) Activity...
Questions
question
Social Studies, 20.03.2020 23:31
question
Mathematics, 20.03.2020 23:31
question
Mathematics, 20.03.2020 23:31
question
Biology, 20.03.2020 23:32
question
History, 20.03.2020 23:32
question
Mathematics, 20.03.2020 23:32