subject
Mathematics, 27.05.2021 22:00 sedratkawaiah13

Two shops makes the same kind of garden shed. The preparation time and assembly time (hours) for Shop A is 5 hour and 20 hours respectively to make one
shed while Shop B times are 10 hours and 5 hours. For the two shops combined
the manufacturer can afford to use up to 200 hours for preparation and 240 hour
for assembly for per week. Shop A earns a profit of $300 per shed and Shop B
earns a profit of $400 per shed. How many sheds per week should the
manufacturer make in each shop to maximize profit?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Find the number of liters in 12.8 gal of gasoline. round to the nearest hundredths
Answers: 2
question
Mathematics, 21.06.2019 19:00
After t seconds, a ball tossed in the air from the ground level reaches a height of h feet given by the equation h = 144t-16t^2. after how many seconds will the ball hit the ground before rebounding?
Answers: 2
question
Mathematics, 21.06.2019 22:20
Question 5 of 10 2 points if a population is a sample of the population could be a. registered voters; all citizens o o b. baptists; all religious people o c. people who purchased shoes; all customers o d. the entire school faculty; math teachers
Answers: 3
question
Mathematics, 21.06.2019 23:30
Arational number that is equivalent to -20/4?
Answers: 1
You know the right answer?
Two shops makes the same kind of garden shed. The preparation time and assembly time (hours) for Sh...
Questions
question
Mathematics, 25.03.2021 15:50
question
Mathematics, 25.03.2021 15:50
question
Chemistry, 25.03.2021 15:50
question
History, 25.03.2021 15:50