Q11 Eight bricklayers on a building site took 25 hours to build a wall.
The Site Manager needs a similar wall built.
He can hire five bricklayers to build this wall.
He needs to know how much longer it will take to build this wall.
How much longer will it take?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
Beth took out a $20,000 loan for college she is borrowing money from two banks. bank a charges an interest rate of 8.5% bank b charges and interest rate of 10.5% after one year alice owes $1860 in interest how much money did she borrow from bank a
Answers: 3
question
Mathematics, 21.06.2019 18:00
What is an alternate exterior angle
Answers: 1
question
Mathematics, 21.06.2019 19:00
When keisha installed a fence along the 200 foot perimeter of her rectangular back yard, she left an opening for a gate.in the diagram below, she used x to represent the length in feet of the gate? what is the value? a. 10 b. 20 c. 25 d. 30
Answers: 1
question
Mathematics, 21.06.2019 22:00
Type the correct answer in the box. consider the system of linear equations below. rewrite one of the two equations above in the form ax + by = c, where a, b, and c are constants, so that the sum of the new equation and the unchanged equation from the original system results in an equation in one variable.
Answers: 2
You know the right answer?
Q11 Eight bricklayers on a building site took 25 hours to build a wall.
The Site Manager need...
Questions
question
Computers and Technology, 20.04.2021 06:40
question
English, 20.04.2021 06:40
question
Biology, 20.04.2021 06:40