subject
Mathematics, 21.05.2021 01:00 BabyRage4900

9 obreros pueden terminar una obra en 6 días. Al cabo de 2 días, se integra un grupo de obreros de tal manera que la obra la entregan con un día de anticipación. ¿Cuántos obreros conformaban el segundo grupo?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Lin is writing an equation to model the proportional relationship between y, the total cost in dollars of downloading videos from a website, and x, the number of videos downloaded. she knows that the total cost to download 3 videos was $12. her work to find the equation is shown below. joylin’s work step 1 k= 3/12= 0.25 step 2 y= 0.25x where did joylin make her first error?
Answers: 2
question
Mathematics, 21.06.2019 21:00
When solving this problem: 3025/5.5 = a/90.75 you get 49912.5 which would be the length of one of the sides of a square when the area is only 90.75 inches. is that answer correct, why, and how is it possible?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Handsome jack is buying a pony made of diamonds. the price of the pony is p dollars, and jack also has to pay a 25% diamond pony tax. which of the following expressions could represent how much jack pays in total for the pony?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Which radical expression is a rational number? a. √ 360 b. √ 644 c. √ 225 d. √ 122
Answers: 1
You know the right answer?
9 obreros pueden terminar una obra en 6 días. Al cabo de 2 días, se integra un grupo de obreros de t...
Questions