12) The risk left over for you to accept or not, after you have done all possible avoidance or mitigation, is called
risk. *
Residual
Remaining
Stuck with
inherent

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
In the diagram of circle o, what is the measure of zabc?
Answers: 2
question
Mathematics, 21.06.2019 22:30
How do you do the foil method with polynomials?
Answers: 1
question
Mathematics, 21.06.2019 23:00
The ratio of the perimeters of two similar triangles is 4: 3. what are the areas of these triangles if the sum of their areas is 130cm2?
Answers: 3
question
Mathematics, 21.06.2019 23:00
Rob filled 5 fewer plastic boxes with football cards than basketball cards. he filled 11 boxes with basketball cards.
Answers: 1
You know the right answer?
12) The risk left over for you to accept or not, after you have done all possible avoidance or miti...
Questions
question
History, 14.05.2021 04:30
question
Mathematics, 14.05.2021 04:30