subject
Mathematics, 19.05.2021 03:10 disneyshree9427

The amount of time required to assemble a television varies inversely with the number of robots used on the assembly line. If 20 robots are able to assemble a television in 40 minutes, how many minutes would it take 32 robots working at the same speed to assemble the television?


The amount of time required to assemble a television varies inversely with the number of robots use

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Arefrigeration system at your company uses temperature sensors fixed to read celsius (°c) values, but the system operators in your control room understand only the fahrenheit scale. you have been asked to make a fahrenheit (°f) label for the high temperature alarm, which is set to ring whenever the system temperature rises above –10°c. what fahrenheit value should you write on the label
Answers: 1
question
Mathematics, 21.06.2019 19:30
Acabinmaker buys 3.5 liters of oat varnish the varnish cost $4.95 per liter what is the total cost of 3.5 liters
Answers: 1
question
Mathematics, 21.06.2019 19:30
Jada has a meal in a restaurant she adds up the prices listed on the menu for everything they ordered and gets a subtotal of $42.00. when the check comes, it says they also need to pay $3.99 in sales tax. what percentage of the subtotal is the sales tax
Answers: 2
question
Mathematics, 22.06.2019 01:00
Azul has 4 green picks and no orange picks.you add orange picks so that there are 2 orange picks for every 1 green pick.how many picks are there now.
Answers: 2
You know the right answer?
The amount of time required to assemble a television varies inversely with the number of robots used...
Questions