subject
Mathematics, 18.05.2021 18:00 famouzgal

A construction company bought 5/6 of a pound of sand mixed with 2 2/3 pounds of cement. A construction worker used 1 1/3 pounds of the mixture. how much mixture is left? A. 3 1/2 B.2 1/3 C. 2 1/6 D. 4 5/6

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Apark is in the shape of a rectangle. the park authorities are planning to build a 2-meter-wide jogging path in the park (shown as the shaded region in the image). what is the area of the jogging path? plz
Answers: 1
question
Mathematics, 21.06.2019 21:30
Noel is hoping to make a profit (in $) on the school play and has determined the function describing the profit to be f(t) = 8t – 2654, where t is the number of tickets sold. what does the number 8 tell you?
Answers: 1
question
Mathematics, 21.06.2019 22:30
What three-dimensional solid have 6 rectangular faces, 2 equal bases that are not rectangles and 18 edges
Answers: 3
question
Mathematics, 22.06.2019 00:00
The width of a rectangle is half as long as the length. the rectangle has an area of 18 square feet. what are the length and width of the rectangle?
Answers: 1
You know the right answer?
A construction company bought 5/6 of a pound of sand mixed with 2 2/3 pounds of cement. A constructi...
Questions
question
Mathematics, 28.01.2020 03:31
question
Mathematics, 28.01.2020 03:31
question
Mathematics, 28.01.2020 03:31