subject
Mathematics, 07.05.2021 19:30 Arellano2373

This line plot shows the estimated amount of glue needed for summer projects at a camp. Kiki chose a project whose estimated amount of glue needed is the estimated amount needed by most projects. James chose a project with the least estimated amount of glue needed. How much more glue is Kiki estimated to need than James?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
To ? nd out how many students are unhappy with the dining hall food, you distribute a survey. which method of surveying would produce the least amount of bias in your data?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Quadrilateral abcd in the figure below represents a scaled-down model of a walkway around a historic site. quadrilateral efgh represents the actual walkway. abcd is similar to efgh. what is the total length, in feet of the actual walkway?
Answers: 2
question
Mathematics, 21.06.2019 23:00
George writes the mixed number as sum and uses the distributive property 1/2.-2/5=1/2-2+2/5=1/2
Answers: 1
question
Mathematics, 22.06.2019 02:30
Multiply and simplify 2x^2 y^3 z^2 · 4xy^4 x^2
Answers: 1
You know the right answer?
This line plot shows the estimated amount of glue needed for summer projects at a camp. Kiki chose a...
Questions
question
Mathematics, 08.02.2022 16:30