Mathematics, 04.05.2021 18:30 radaishasmithoxngbj
Quintin works 8 hours every day. He estimated that it would take him 6 days to build some cabinets. He charges $28 an hour for his labor. He quoted Mr. Rodriguez $1,340 for the job. What was the result of his estimate?
A. His estimate was accurate; both parties received exactly what they should.
B. His estimate was close enough; both parties received a fair deal.
C. His estimate was too low; Quintin has undercharged Mr. Rodriguez.
D. His estimate was too high; Quintin has overcharged Mr. Rodriguez.
Answers: 2
Mathematics, 21.06.2019 18:30
The base of a triangle exceeds the height by 9 inches. if the area is 180 square inches, find the length of the base and the height of the triangle.
Answers: 1
Mathematics, 22.06.2019 04:00
Going from point a to point b, the cheetah traveled at an average rate of 70 mph. returning to point a, the cheetah traveled at an average rate of 40 mph. can we say that this cheetah’s average rate was 55 mph? uchet write an equation for the average rate for the trip. remember, the cheetah runs from point a to point b and back to point a. first leg of trip: second leg of trip: ⦁ the following equation represents the average rate for the trip. is this equation equivalent to the one you wrote above? explain why or why not.
Answers: 2
Quintin works 8 hours every day. He estimated that it would take him 6 days to build some cabinets....
Biology, 28.08.2019 10:30
Biology, 28.08.2019 10:30
Mathematics, 28.08.2019 10:30
Social Studies, 28.08.2019 10:30
Mathematics, 28.08.2019 10:30
Mathematics, 28.08.2019 10:30
Social Studies, 28.08.2019 10:30
Physics, 28.08.2019 10:30