subject
Mathematics, 29.04.2021 16:30 nora45102p45bzz

Q5) A penalty clause states that a contractor will forfeit a certain sum of money for each day that they are late in completing a contract. If they are 6 days late they received $ 5000. If they are 14 days late they received $ 3000a) Find the amount of the daily forfeit. B) Determine the value of the original contract. Note: Apply both algebraic and matrices inversion techniques for a and b.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
question
Mathematics, 21.06.2019 19:30
Im literally having a mental breakdown
Answers: 1
question
Mathematics, 21.06.2019 19:30
Find the commission on a $590.00 sale if the commission is 15%.
Answers: 2
question
Mathematics, 22.06.2019 03:30
Aking and his army will attempt to capture a fortress. the left and right flanks break off from the main group to attack the west and east guard towers. suppose the left flank has a 60% chance of success and the right flank has a 75% chance of success, independently of one another. if both flanks capture their respective targets, then the king has a 98% chance of successfully taking the fort. if, however, only the left flank captures its tower, the king has an 80% chance of success; if only the right flank succeeds, the king has a 50% chance. if both flanks fail, then the king's chance of capturing the fort drops to 20%. it turns out the king captures the fort. what is the probability that one, and only one, flank was successful (either the left, or the right, but not both)? (round your answer to 3 decimal places)
Answers: 2
You know the right answer?
Q5) A penalty clause states that a contractor will forfeit a certain sum of money for each day that...
Questions
question
Chemistry, 26.11.2020 18:20
question
Arts, 26.11.2020 18:20
question
Mathematics, 26.11.2020 18:20
question
Mathematics, 26.11.2020 18:20
question
Social Studies, 26.11.2020 18:20