subject
Mathematics, 26.04.2021 04:50 ShawnSaviro4918

T and I Construction is paving a rectangular-shaped parking lot with Hot Asphalt Mix. The parking lot is 100 yards by 44 yards and will have a 9-inch base. If the Hot Asphalt Mix has a density of 140 pounds per cubic foot, about how many tons of mix will be needed to pave the parking lot? A.) 77
B.) 91
C.) 2079
D.) 2772

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Oscar and julie ashton are celebrating their 15th anniversary by having a reception hall. they have budgeted $4,500 for their reception. if the reception hall charges a $90 cleanup fee plus & 36 per person, find the greatest number of people that they may invite and still stay within their budget.
Answers: 1
question
Mathematics, 21.06.2019 18:10
The means and mean absolute deviations of the individual times of members on two 4x400-meter relay track teams are shown in the table below. means and mean absolute deviations of individual times of members of 4x400-meter relay track teams team a team b mean 59.32 s 59.1 s mean absolute deviation 1.5 s 245 what percent of team b's mean absolute deviation is the difference in the means? 9% 15% 25% 65%
Answers: 2
question
Mathematics, 21.06.2019 20:30
Aswimming pool had 2.5 million liters of water in it. some water evaporated, and then the pool only had 22 million liters of water in it. what percent of the water evaporated?
Answers: 2
question
Mathematics, 21.06.2019 23:30
Solve the equation: x - 9 = -6 + 5 a. 21 b. 7 c. 14 d. 2
Answers: 2
You know the right answer?
T and I Construction is paving a rectangular-shaped parking lot with Hot Asphalt Mix. The parking lo...
Questions
question
English, 08.03.2021 15:10
question
Computers and Technology, 08.03.2021 15:10